7th April & 8th April 2010
We went to Central Control Room a.k.a CCR. That place is the place control everything and monitoring everything at power plant. So, we not allowed to capture any picture because of national security. There, we spent a lot of time learned about the system they use and how all the stuff in CCR operate (alarm systems, monitoring system and etc). After that we learned what is single line diagram. At Putrajaya Power Station have 2 types of single line which are SAG (Siemens) single line diagram (for GT1 & GT2) and GE single line diagram (for GT3, GT4 & GT5). It generates about 650MW and connected to the national grid under the command of NLDC in Bangsar.
9th April 2010
Followed the technician to do some checking and maintenance on the air conditioner at GT since it is not working. After that we lepak2 at CCR, read the manuals, borak2 with technician and read the maintenance plus operations maintenace.
0 comments: